ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Advice on building "storage servers" with two DL380 G7 servers

    SAM-SD
    storage file server proliant dl380 g7 backup secondary storage
    9
    99
    15.6k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S
      Shuey @Kris_K
      last edited by

      @kris_k Sorry, typo on my part (I had RAID 10 on the brain since I was talking about wanting to do RAID 10 on the big array).

      Unfortunately, my company is very tight with money, so they don't want to buy new. They only intend on buying whatever parts I need in order to upgrade these servers (all from Amazon.com).

      K 1 Reply Last reply Reply Quote 0
      • K
        Kris_K @Shuey
        last edited by

        @shuey
        Don't buy new. Buy Dell refurb from xbyte 🙂

        S 1 Reply Last reply Reply Quote 3
        • S
          Shuey @Kris_K
          last edited by

          @kris_k If I could convince them, that'd be great. But the likelihood of that is slim :(... They refuse to buy from ANYONE, OTHER THAN Amazon :-x....

          At this stage, it seems in my best interest to spec out what they're willing to pay for, and present them with THAT info.

          scottalanmillerS 1 Reply Last reply Reply Quote 0
          • scottalanmillerS
            scottalanmiller @Shuey
            last edited by

            @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

            @kris_k If I could convince them, that'd be great. But the likelihood of that is slim :(... They refuse to buy from ANYONE, OTHER THAN Amazon :-x....

            So they aren't cheap. Just not good with money.

            1 Reply Last reply Reply Quote 3
            • scottalanmillerS
              scottalanmiller
              last edited by

              I agree that this is likely an expensive way to go. Two servers instead of one, lots of parts instead of purpose built, investing in old gear (technical debt) that isn't too old to use, but is probably too old to invest into. This will cost nearly as much to buy as a new, proper server, might actually cost more due to being stuck with smaller drives and such, will require more power to operate, more complexity to deal with multiple devices and so forth.

              By the time you are switching out for PSUs, getting new drive cages, etc. you'll have more than bought a real server. It's hard to believe that this is a "buying less" option in the long run.

              1 Reply Last reply Reply Quote 1
              • DashrenderD
                Dashrender
                last edited by

                This one is actually pretty easy - build both solutions on paper. See which one comes out on top.

                For your current servers, you already said you want to buy the extra 8 drive bay, you will need two different power supplies to hand the full load of 16 drives on a single Power Supply. And the RAID controller P411 only supports 8 ports, so you'll need another controller.
                Toss in the cost of drives, and bob's your uncle.

                Or find the parts you need, then get a quote from XByte for those more modern parts.

                Also, do you know what your storage requirements are? what your IOPs requirements are? What are you storing on these servers?

                1 Reply Last reply Reply Quote 0
                • DashrenderD
                  Dashrender @Shuey
                  last edited by

                  @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                  (the original two drives will still host the OS, and the remaining 14 drives would be pooled into one big RAID 10 array; on each server).

                  this seems like the wrong way to go. You should likely run the entire array as a OBR10, install a hypervisor on it, then build giant storage VMs as needed.

                  scottalanmillerS 1 Reply Last reply Reply Quote 0
                  • scottalanmillerS
                    scottalanmiller @Dashrender
                    last edited by

                    @dashrender said in Advice on building "storage servers" with two DL380 G7 servers:

                    @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                    (the original two drives will still host the OS, and the remaining 14 drives would be pooled into one big RAID 10 array; on each server).

                    this seems like the wrong way to go. You should likely run the entire array as a OBR10, install a hypervisor on it, then build giant storage VMs as needed.

                    It's for backup, so OBR6 most likely.

                    1 Reply Last reply Reply Quote 2
                    • S
                      Shuey
                      last edited by

                      Thanks for all the feedback guys! I got on a live chat this morning with xByte and will be getting a quote later today. Can't hurt to at least see what they have to offer and get a price ;).

                      scottalanmillerS J 2 Replies Last reply Reply Quote 2
                      • scottalanmillerS
                        scottalanmiller @Shuey
                        last edited by

                        @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                        Thanks for all the feedback guys! I got on a live chat this morning with xByte and will be getting a quote later today. Can't hurt to at least see what they have to offer and get a price ;).

                        Awesome. I bet that they can beat any piecing together of parts for old gear.

                        1 Reply Last reply Reply Quote 2
                        • S
                          Shuey
                          last edited by

                          Here's what they quoted me:

                          • R730XD-2CPU Dell PowerEdge R730xd Server ( 2 CPU Version) (1)
                          • Dell PowerEdge R730xd 3.5" Chassis with up to 12 Hard Drives (1)
                          • Intel E5-2609v3 1.9GHz/15M/1600MHz 6-Core 85W (2)
                          • Dell PE R730 Normal Heat Sink (2)
                          • Dell 4GB DDR4 Reg (4)
                          • PERC H730P Mini Mono Controller 2GB NV Cache (RAID 0/1/5/6/10/50/60) (1)
                          • Dell 4TB 3.5" 7.2K NL SAS 12Gbs HDD (10)
                          • Intel Ethernet I350 QP 1Gb Network Daughter Card (1)
                          • iDRAC8 Enterprise (1)
                          • Dell 2U Sliding Ready Rails (1)
                          • Dell 13th Gen 750W Redundant PSU (1)
                          • 5 Year Dell NBD Onsite Warranty (1)

                          Total: $6,152.00

                          matteo nunziatiM scottalanmillerS 2 Replies Last reply Reply Quote 2
                          • J
                            Jimmy9008 @Shuey
                            last edited by Jimmy9008

                            @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                            Thanks for all the feedback guys! I got on a live chat this morning with xByte and will be getting a quote later today. Can't hurt to at least see what they have to offer and get a price ;).

                            I've always found that Dell beat xByte when its their end of quarter and end of year; you then get all new kit rather than refurbished. Of course you do have to haggle. From memory, Dell operate Feb - April = Q1, May - July = Q2, Aug - Oct = Q3 and Nov - Jan = their end of year... if you can wait until the last week of each you get great sales usually where they hit low prices to nail their targets.

                            scottalanmillerS 1 Reply Last reply Reply Quote 1
                            • matteo nunziatiM
                              matteo nunziati @Shuey
                              last edited by

                              @shuey why 2 cpu for a nas?! Wasn't 1 just enough?

                              S 1 Reply Last reply Reply Quote 0
                              • S
                                Shuey @matteo nunziati
                                last edited by

                                @matteo-nunziati It wasn't an option of 1 or 2. If you look at their product page, they ONLY sell a 2 CPU configuration (at least for the models I reviewed).

                                matteo nunziatiM 1 Reply Last reply Reply Quote 0
                                • matteo nunziatiM
                                  matteo nunziati
                                  last edited by

                                  @Shuey also how much do you can afford for offline? NBD for backup seems ok to me. But Maybe you would consider prosupport?!

                                  scottalanmillerS S 2 Replies Last reply Reply Quote 0
                                  • matteo nunziatiM
                                    matteo nunziati @Shuey
                                    last edited by matteo nunziati

                                    @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                                    @matteo-nunziati It wasn't an option of 1 or 2. If you look at their product page, they ONLY sell a 2 CPU configuration (at least for the models I reviewed).

                                    Ok! I Never look at xbyte: customs + shipping are too high from america to europe 😞

                                    1 Reply Last reply Reply Quote 1
                                    • scottalanmillerS
                                      scottalanmiller @matteo nunziati
                                      last edited by

                                      @matteo-nunziati said in Advice on building "storage servers" with two DL380 G7 servers:

                                      @Shuey also how much do you can afford for offline? NBD for backup seems ok to me. But Maybe you would consider prosupport?!

                                      I agree, consider moving to NBD support. Compare as much apples to apples as you can.

                                      1 Reply Last reply Reply Quote 0
                                      • scottalanmillerS
                                        scottalanmiller @Jimmy9008
                                        last edited by

                                        @jimmy9008 said in Advice on building "storage servers" with two DL380 G7 servers:

                                        @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                                        Thanks for all the feedback guys! I got on a live chat this morning with xByte and will be getting a quote later today. Can't hurt to at least see what they have to offer and get a price ;).

                                        I've always found that Dell beat xByte when its their end of quarter and end of year; you then get all new kit rather than refurbished. Of course you do have to haggle. From memory, Dell operate Feb - April = Q1, May - July = Q2, Aug - Oct = Q3 and Nov - Jan = their end of year... if you can wait until the last week of each you get great sales usually where they hit low prices to nail their targets.

                                        Only for new, and he should not be considering new here, only refurb.

                                        J 1 Reply Last reply Reply Quote 1
                                        • scottalanmillerS
                                          scottalanmiller @Shuey
                                          last edited by

                                          @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                                          Here's what they quoted me:

                                          • R730XD-2CPU Dell PowerEdge R730xd Server ( 2 CPU Version) (1)
                                          • Dell PowerEdge R730xd 3.5" Chassis with up to 12 Hard Drives (1)
                                          • Intel E5-2609v3 1.9GHz/15M/1600MHz 6-Core 85W (2)
                                          • Dell PE R730 Normal Heat Sink (2)
                                          • Dell 4GB DDR4 Reg (4)
                                          • PERC H730P Mini Mono Controller 2GB NV Cache (RAID 0/1/5/6/10/50/60) (1)
                                          • Dell 4TB 3.5" 7.2K NL SAS 12Gbs HDD (10)
                                          • Intel Ethernet I350 QP 1Gb Network Daughter Card (1)
                                          • iDRAC8 Enterprise (1)
                                          • Dell 2U Sliding Ready Rails (1)
                                          • Dell 13th Gen 750W Redundant PSU (1)
                                          • 5 Year Dell NBD Onsite Warranty (1)

                                          Total: $6,152.00

                                          So here are my thoughts, and call your rep, don't just go by what the site list.

                                          1. Why R730xd instead of the R720xd which is still overkill. This isn't the right model for you.
                                          2. Are you totally sure that the R520 won't do what you need? I think that it likely will, and will cut the cost by a lot.
                                          3. Two sexacore procs is twelve cores. That's a LOT. One quad core is plenty. Have them check on a single, small proc R520.
                                          ObsolesceO 1 Reply Last reply Reply Quote 2
                                          • ObsolesceO
                                            Obsolesce @scottalanmiller
                                            last edited by

                                            @scottalanmiller said in Advice on building "storage servers" with two DL380 G7 servers:

                                            @shuey said in Advice on building "storage servers" with two DL380 G7 servers:

                                            Here's what they quoted me:

                                            • R730XD-2CPU Dell PowerEdge R730xd Server ( 2 CPU Version) (1)
                                            • Dell PowerEdge R730xd 3.5" Chassis with up to 12 Hard Drives (1)
                                            • Intel E5-2609v3 1.9GHz/15M/1600MHz 6-Core 85W (2)
                                            • Dell PE R730 Normal Heat Sink (2)
                                            • Dell 4GB DDR4 Reg (4)
                                            • PERC H730P Mini Mono Controller 2GB NV Cache (RAID 0/1/5/6/10/50/60) (1)
                                            • Dell 4TB 3.5" 7.2K NL SAS 12Gbs HDD (10)
                                            • Intel Ethernet I350 QP 1Gb Network Daughter Card (1)
                                            • iDRAC8 Enterprise (1)
                                            • Dell 2U Sliding Ready Rails (1)
                                            • Dell 13th Gen 750W Redundant PSU (1)
                                            • 5 Year Dell NBD Onsite Warranty (1)

                                            Total: $6,152.00

                                            So here are my thoughts, and call your rep, don't just go by what the site list.

                                            1. Why R730xd instead of the R720xd which is still overkill. This isn't the right model for you.
                                            2. Are you totally sure that the R520 won't do what you need? I think that it likely will, and will cut the cost by a lot.
                                            3. Two sexacore procs is twelve cores. That's a LOT. One quad core is plenty. Have them check on a single, small proc R520.

                                            Yeah that's a lot of computing power just for storage. You didn't list any other uses so all that just to store backups is overkill.

                                            1 Reply Last reply Reply Quote 1
                                            • 1
                                            • 2
                                            • 3
                                            • 4
                                            • 5
                                            • 4 / 5
                                            • First post
                                              Last post