ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Server refresh - when should I?

    Scheduled Pinned Locked Moved IT Discussion
    19 Posts 6 Posters 2.7k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • C
      Carnival Boy @Dashrender
      last edited by

      @Dashrender said:

      Upgrading the RAM and the drives is probably 60-70% of the cost of a complete server replacement. The last purchase I made, the server and second power supply was under $3K compared to the nearly $4k for RAM and disk.

      I'll need to do some sums. But given that we can capitalise a new server over 5 years, but couldn't capitalise new RAM and disks for the old server, a new server may make the most sense financially.

      1 Reply Last reply Reply Quote 0
      • alexntgA
        alexntg
        last edited by

        There's plenty of things to factor in. How energy efficient are the new servers? If it's a healthy gap, you're losing money by keeping the old stuff running, and once you do the required math, you'll have a better idea on the lost cost savings by waiting. It might be a little, or it might be a lot, depending on the types of servers and configuration. Also, there's the consideration of density. A G8 has much more computing power than a G6, allowing it to hold a greater number of VMs. Theoretically, you could reduce the number of servers total, requiring less management overhead and operational cost.

        Why are you still on ESXi 5.1? Your vSphere environment should be under maintenance. If your hosts are on the HCL for 5.5, go ahead and upgrade ESXi. If the hosts aren't on the HCL, it's a good sign that it's time to upgrade.

        C 1 Reply Last reply Reply Quote 0
        • scottalanmillerS
          scottalanmiller
          last edited by

          New servers typically make sense over upgrades. Upgrades have a huge price premium on parts, new servers have discounts.

          New servers are smaller, faster, more reliable and more power efficient.

          C 1 Reply Last reply Reply Quote 0
          • C
            Carnival Boy @alexntg
            last edited by

            @alexntg said:

            Why are you still on ESXi 5.1?

            Because upgrading requires coming in on a Sunday and doing an upgrade that I'm not completely comfortable with. Basically, I don't like working Sundays and always put it off. It's not like I'd get paid or get time off in lieu, or if anyone I work with would even know I'd worked on Sunday.

            TL;DR...I'm too lazy.

            1 Reply Last reply Reply Quote 0
            • C
              Carnival Boy @scottalanmiller
              last edited by

              @scottalanmiller said:

              New servers typically make sense over upgrades. Upgrades have a huge price premium on parts, new servers have discounts.

              New servers are smaller, faster, more reliable and more power efficient.

              Really, is there much of a difference between the 6th and 8th generation Proliants? They seem to have similar parts to me. I can see that moving to solid state drives will make a difference (but that's still very expensive), but otherwise?

              scottalanmillerS 1 Reply Last reply Reply Quote 0
              • garak0410G
                garak0410 @scottalanmiller
                last edited by

                @scottalanmiller said:

                Five years is most definitely not too old for a server. In the enterprise space eight years is common and ten years isn't unheard of. At some point you pay too much in maintenance and that is really what makes the swing as long as everything else is still good.

                I second his comment. Scott talked me into keeping our PowerEdge 2900 as a second virtual host and I am going to use it for development and application serving. We had some doubts about it not being up to the task but I turned on virtualization and it is working great. Though my RAID card says the battery needs replacement.

                1 Reply Last reply Reply Quote 0
                • scottalanmillerS
                  scottalanmiller @Carnival Boy
                  last edited by

                  @Carnival-Boy said:

                  @scottalanmiller said:

                  New servers typically make sense over upgrades. Upgrades have a huge price premium on parts, new servers have discounts.

                  New servers are smaller, faster, more reliable and more power efficient.

                  Really, is there much of a difference between the 6th and 8th generation Proliants? They seem to have similar parts to me. I can see that moving to solid state drives will make a difference (but that's still very expensive), but otherwise?

                  There are improvements, yes. Cheaper, faster parts mostly. More cores at faster speeds for less money. And the ILO4 is sweet. It's not a huge leap. But old memory is super expensive.

                  1 Reply Last reply Reply Quote 0
                  • C
                    Carnival Boy
                    last edited by

                    Any issues migrating a VM from a G8 server to a G6 (and vice versa). I recall there can be issues when running different CPUs, although am I right in think that this only effects vMotion? We don't have vMotion, and so shut down the VMs and start them up on the new host.

                    alexntgA scottalanmillerS 2 Replies Last reply Reply Quote 0
                    • alexntgA
                      alexntg @Carnival Boy
                      last edited by

                      @Carnival-Boy said:

                      Any issues migrating a VM from a G8 server to a G6 (and vice versa). I recall there can be issues when running different CPUs, although am I right in think that this only effects vMotion? We don't have vMotion, and so shut down the VMs and start them up on the new host.

                      If it's a cold move, you're fine. vMotion is where it gets tricky, and there's even ways around that.

                      1 Reply Last reply Reply Quote 1
                      • scottalanmillerS
                        scottalanmiller @Carnival Boy
                        last edited by

                        @Carnival-Boy said:

                        Any issues migrating a VM from a G8 server to a G6 (and vice versa). I recall there can be issues when running different CPUs, although am I right in think that this only effects vMotion? We don't have vMotion, and so shut down the VMs and start them up on the new host.

                        As long as you are migrating cold you can move from an HP Intel box to a SuperMicro AMD box and it won't care. Only hot migrations are an issue.

                        1 Reply Last reply Reply Quote 0
                        • 1 / 1
                        • First post
                          Last post